The Brief

Client: Paton Developments

Industry: Construction and Distribution

Products: Link 51Wide Aisle Pallet Racking

Location: Farnborough, Hampshire

Date: November 2015

The Solution

P&D Projects have recently completed a new pallet racking installation at the new distribution hub of Paton Developments in Farnborough, Hampshire.

Following a series of discussions regarding optimising the layout, a wide aisle system was agreed upon whereby the counter balance truck had plenty of room to operate.

The Link 51 pallet racking frames were supplied slightly higher than actually required allowing the flexibility for additional storage levels to be introduced at a later date with minimum disruption to the day to day operation of the business.

A total of 432 pallet positions have been created with 1100mm frame depth suitable for the Euro Pallets that Paton Developments receive.

This project was taken to site and built within 3 weeks of the instruction to proceed with the frames arriving preassembled from the factory to minimise the build time.

If you would like to find out more about our service and how we can help your business, please call us on 01344 623100 or email enquiries@panddprojects.co.uk

Make an Enquiry
Paton Developments-01Paton Developments-02Paton Developments-03Paton Developments-04

P&D Projects fitted out our 6000 square foot facility with a drive in racking system, 2 mezzanine floors, new sales offices with kitchen area, shelving and heavy duty pallet racking system. Professional, competitive and always with a sense of humour to hand they did an outstanding job.

- Philip Shaw, Managing Director, The Ramp People, Esher -

Where to Find Us

Company Info

P&D Projects Ltd

1000 Lakeside North Harbour Western Road Hampshire PO6 3EZ

01344 623100

Request a Call Back